







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Santa Ana, CA: What to Expect
Cabinets & countertops in Santa Ana typically run $14,000 – $45,000 for a full kitchen tear-out and replacement, with most single-family jobs landing near the middle of that range. A straight cabinet swap with new counters takes 4 – 7 working days from first hammer to final caulk line. On a 1920s bungalow near Lacy Park, the same job can stretch to 10 – 14 days once original framing and out-of-plumb walls surface. Call (833) 749-3967 for a free on-site estimate.
How the Job Actually Runs, Day by Day

Cabinet and countertop work looks simple from the doorway. It isn’t. Here’s the sequence we follow on nearly every Santa Ana kitchen, and where you’ll be making decisions.
Stage 1: Measure and site check (day 0, about 90 minutes)
We laser-measure every wall, check for plumb and level, and photograph the electrical and plumbing rough-ins so we know what’s behind the drywall before demo. This is where you decide the layout: keep the existing footprint, or move the sink or range. Moving either one adds real cost, and we’ll tell you the number before you commit.
Stage 2: Demo and prep (day 1)
Old cabinets and counters come out, appliances get pulled, and we inspect what the tear-out reveals. In older Santa Ana homes this is the moment we find water-damaged subfloor, knob-and-tube wiring feeding an old disposal, or a wall that isn’t square by two inches. Each discovery gets a phone call and an upfront price before any repair work starts. You approve or we stop. No surprise line items on the final invoice.
Stage 3: Cabinet install (days 2 – 4)
Base cabinets set first, shimmed and scribed to the wall, then uppers hung off a ledger. We level the entire run, not just each box, because counters sit on top of this and any dip shows up later. You’ve already picked the door style and finish at the estimate; by this point the cabinets are on site and the decision is behind you.
Stage 4: Template and counter fabrication (days 4 – 7)
For stone counters, a fabricator templates the installed cabinets once they’re final and locked in. Template to install is typically 3 – 5 business days. Laminate and butcher block skip the template step and go in the same week. This is the stretch when your kitchen is unusable, so plan meals around it.
Stage 5: Counter set, sink, and final walk (days 7 – 10)
Counters get set, the sink and faucet go in, seams get filled and polished, and we walk the whole job with you. Anything you flag comes back to us under the 730-Day Done Right Promise: if it isn’t done right, we make it right. That written guarantee is one of the longest workmanship warranties in residential construction.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Move This Job
Most of the budget swings happen at the cabinet and counter selection meeting, not in the labor. Here’s what you’re deciding between and what each choice really gets you.
- Stock vs. semi-custom cabinets. Stock boxes (sold in fixed widths) are the cheapest way in and can be shimmed into an old kitchen, but they leave awkward filler strips against out-of-square walls. Semi-custom (KraftMaid is our go-to here) lets you hit odd widths and plumb problems with real cabinet instead of filler. Expect the semi-custom premium to run roughly 20 – 30% over stock.
- Quartz vs. granite vs. laminate. Quartz is non-porous and needs no sealing; it’s the default for a reason. Granite is gorgeous and unique but wants re-sealing every year or two. Laminate is the budget play at a fraction of the cost, though heat and moisture will find its seams over time. Cambria quartz sits at the top of the durability scale if you want stone that won’t stain.
- Full-overlay vs. framed doors. Full-overlay gives a clean, modern face and more usable interior. Framed doors (face-frame construction) are historically correct for a 1930s Craftsman or Spanish Colonial Revival and suit those homes better.
- Slab backsplash vs. 4-inch splash vs. tile. A full slab behind the range is the cleanest look and the easiest to wipe, at a real cost bump. A short 4-inch splash is standard and least expensive. Anything in between is a separate decision.
- Under-cabinet lighting and outlet placement. Cheap to add during demo, expensive to retrofit after. Decide now.
What Cabinets & Countertops Costs in Santa Ana, CA

Full cabinets & countertops projects in Santa Ana run $14,000 – $45,000. Within that, a cabinet-only replacement is $4,000 – $13,000, a countertop-only job is $2,000 – $6,500, and a backsplash add-on is $800 – $2,500. A new island, if the layout has room, is $3,000 – $10,000. Here’s what pushes a job toward one end of that range or the other.
- Kitchen size and cabinet count. A small galley with 12 linear feet of cabinet is not the same job as a 30-foot U-shape with an island.
- Condition behind the walls. Out-of-plumb walls, rotted subfloor, or knob-and-tube wiring in a pre-1950s home adds repair cost that no one sees from the estimate photos.
- Relocating plumbing or electrical. Moving a sink or range means new rough-in, a permit amendment, and more labor. Keep them where they are and the number drops.
- Material grade. Stock cabinets with laminate counters sit near the bottom. Semi-custom with quartz and a slab splash sit near the top.
- Permit scope. A like-for-like swap may need no permit; anything structural, or any relocation of plumbing or gas, pulls one, and that adds fees and inspection scheduling.
Your written estimate lists each line item: cabinet boxes, doors, counters, demo, haul-away, permits if required, and labor. What it typically does not include: appliance purchase, new flooring (that’s a separate job), and any repair the demo uncovers, which we price before doing. The number you see is the number you pay. Call (833) 749-3967 for a free on-site estimate and a written line-item quote.
See the difference
Before
After
Before
After
Before
AfterWhat Santa Ana Homes Specifically Do to This Job
Santa Ana is a market of contradictions, and it shows up on every job. The city has a deep stock of 1920s – 1950s California bungalows, Spanish Colonial Revival and Craftsman homes, plus postwar stucco tract housing, and it’s simultaneously pushing aggressive infill under its adaptive-reuse and SB 9 lot-split rules. On the same block you’ll find a 1930s bungalow getting a historic-preservation review of its original redwood framing and clay sewer laterals, and a teardown-to-townhome infill going up next door. When we pull cabinets in a Lacy-area or downtown bungalow, we expect to find original framing that isn’t square and walls that have moved a half inch over 90 years. Foundation retrofits and seismic bolting are routine prep on those homes. Our service-area page for Santa Ana covers the neighborhoods we work most. If the scope grows beyond cabinets and counters into a full kitchen, see Kitchen Remodeling in Santa Ana.
Serving Santa Ana, CA – Our Local Coverage Area
We serve Santa Ana and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Santa Ana

A standard kitchen takes 4 – 7 working days for a straight swap and 10 – 14 days when demo uncovers repairs in an older home. Stone counters add the 3 – 5 day template-to-install window. Call (833) 749-3967 and we’ll give you a realistic date range, not a best-case guess.
Like-for-like cabinet and countertop replacement usually does not require a permit in Santa Ana. Anything structural, or any move of plumbing, gas, or electrical, does, and we pull the permit and manage the inspection. We tell you which side of that line your job sits on at the estimate.
Yes, and that’s the majority of what we do. Keeping the sink and range where they are keeps the job simpler and less expensive. If you want to move them, we price the rough-in work upfront so there’s no surprise.
Full projects run $14,000 – $45,000, cabinet-only work is $4,000 – $13,000, and countertop-only work is $2,000 – $6,500. Cost is driven by kitchen size, material grade, and what demo uncovers. Our quotes include $1,000 off projects over $10,000 and 0% financing for 18 months.
All cabinets & countertops work is backed by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That covers workmanship for two full years. Call (833) 749-3967 with any question.
Get a Free Cabinets & Countertops Estimate in Santa Ana
Call (833) 749-3967 to schedule a free on-site estimate. A live person answers 24/7, so you won’t hit voicemail. We’ll measure the kitchen, talk through cabinet and counter options, and hand you a written line-item quote with no surprises. Our technicians have up to 12 years of experience, and every job is backed by the 730-Day Done Right Promise. If the bathroom is on your list too, homeowners often pair this with Walk-In Showers & Shower Remodeling in Santa Ana or a Tub-to-Shower Conversion in Santa Ana, and our kitchen remodeling service handles the wider scope.
Written by the team at Groundwork Construction Co.












