







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Laguna Beach, CA: What the Job Really Involves
New cabinets and countertops in Laguna Beach typically run $14,000 – $45,000 for a full kitchen’s worth, with most projects finished in three to five weeks from demo to final caulk. Cabinet installation alone lands at $4,000 – $13,000, countertop fabrication and install at $2,000 – $6,500, and a backsplash at $800 – $2,500. The wildcard here isn’t the material you pick; it’s getting boxes, slabs, and a crew up a canyon staircase or through a four-foot alley-side gate. Call us at (833) 749-3967 for a free on-site estimate and we’ll walk the access before we quote a number.
How we run a cabinet and countertop job, stage by stage

Every kitchen we re-box has a rhythm to it. Here’s the actual sequence, with the decisions you’ll be making at each stage so nothing lands on you at the last minute.
Stage 1: Site walk and field measure (day 1, about 90 minutes). We photograph the existing run, drop a laser on the walls, and check how far out of plumb the room is. In Laguna Beach’s older cottages, a wall that looks square can be three-quarters of an inch off across ten feet, and that number decides whether we fur out the wall or scribe the cabinets. You confirm your appliance models now, because the fridge and range dimensions drive the box sizes.
Stage 2: Demo and prep (days 2 – 3). Old cabinets and counters come out, and the debris goes down the same stairs or lane it came up. We inspect the wall cavity for water damage, old knob-and-tube, or a gas stub that needs relocating. You sign off on any change order before we touch the framing. Drywall patching and paint prep happen here, not later.
Stage 3: Cabinet set (days 4 – 5). Base cabinets go in first, leveled and shimmed, then uppers, then filler panels and crown. This is where the room starts to look like a kitchen again. You pick door style, finish, and hardware placement before this stage, not during.
Stage 4: Countertop template (day 6). We template the finished boxes for the slab. Stone gets fabricated off-site, typically 5 – 7 working days, so there’s a natural pause here. That gap is your window to lock in the sink and faucet so the fabricator can cut the cutouts correctly.
Stage 5: Counter install, sink, and final trim (days 12 – 15). Slab goes down, undermount sink gets set and sealed, faucet connects, toe kicks and end panels finish, caulk lines get run, and we do a final walkthrough with you. A typical Laguna Beach kitchen closes out around day 18 – 22 total.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually be choosing between
Most of the decisions that make or break a kitchen come down to a handful of material and configuration calls. Here’s the honest trade-off on each.
- Cabinet box construction: Plywood boxes hold up to moisture and decades of use; particleboard is cheaper but swells if a leak ever gets behind the sink. For a beach-cottage kitchen with salt air and humidity, we steer people toward plywood.
- Door and drawer fronts: Painted MDF gives you a clean slab or shaker look at a lower price; solid wood and plywood veneer wear better around the handle pulls. KraftMaid is our go-to for the mid-to-upper range because the finish holds up in coastal humidity.
- Countertop material: Quartz is non-porous, resists staining, and doesn’t need sealing, which suits a busy household. Granite is more forgiving on heat and shows fewer fingerprints. Soapstone and butcher block are lovely but want oiling. Slab cost and edge profile move the number most.
- Sink and faucet: A single-bowl undermount in a hard-working kitchen; Grohe and Kohler are the two brands we fit most often because the cartridges last.
- Backsplash: Full-height slab reads the most modern and is the easiest to wipe down; a 4-inch splash or a tile run keeps the budget lower.
- Hardware: Pulls and knobs are the cheapest way to change a kitchen’s feel. Bar pulls on shaker doors, cup pulls on inset cabinetry.
If the project grows into a wider scope, homeowners often pair this with Walk-In Showers & Shower Remodeling in Laguna Beach so both hard-working rooms in the house get done in one pass.
What Cabinets & Countertops costs in Laguna Beach, CA

Plan on $14,000 – $45,000 for a full kitchen’s worth of cabinets and countertops in Laguna Beach, with cabinet installation at $4,000 – $13,000, countertop install at $2,000 – $6,500, and a backsplash at $800 – $2,500 if you’re adding one. Line-item ranges:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop fabrication & install | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Full cabinets & countertops project | $14,000 – $45,000 |
Five things push a job from the low end to the high end. Kitchen size and layout: a galley run of eight feet is a different job than an L-shape with an island. Existing condition: water damage behind the sink, out-of-plumb walls, or a floor that needs leveling adds labor. Relocating plumbing, gas, or electrical: moving a range or sink a few feet is real trade work. Material grade: entry-level stock boxes and laminate counters versus custom fronts and a quartz slab. Permit scope: a like-for-like swap usually needs none, but if we move walls or add a gas line, the city gets involved.
Every written estimate itemizes cabinets, countertops, labor, delivery, and haul-away. Our upfront pricing means the number you see is the number you pay, with no change orders unless you approve them first. What you’d budget separately: appliances, plumbing fixtures if you’re upgrading them, and any flooring you’d want to replace while the room is open.
See the difference
Before
After
Before
After
Before
AfterWhat Laguna Beach homes specifically do to this job
Building anything in Laguna Beach runs through the city’s Community Development Department, and much of town sits in the coastal zone where the California Coastal Commission can weigh in on anything that affects public viewsheds. That matters for cabinets and countertops in one specific way: if your project changes a window opening or exterior wall, the design-review clock starts. A pure interior cabinet swap inside an existing footprint stays out of that process. Get it wrong and you’re waiting on a review board while your slab sits in a warehouse.
Access is the other reality. Cottage kitchens tucked into canyon and hillside lots off streets like the Coast Highway or into Temple Hills often have no driveway, so cabinets and slabs come up stairs or via a private lane, and we stage on the street. Marine-layer humidity and salt air get into the wall cavity behind the counters, so we check for moisture before we set boxes. And in the older 1920s – 1950s bungalows, the plumbing stub-outs are frequently past their lifespan, which is why we inspect before we template. Homeowners here often pair this with Tub-to-Shower Conversion in Laguna Beach to finish the two toughest rooms in the house.
Serving Laguna Beach, CA – Our Local Coverage Area
We serve Laguna Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about Cabinets & Countertops in Laguna Beach

Three to five weeks is typical, with the countertop fabrication pause eating 5 – 7 working days. Cabinet set takes two days, template happens around day six, and install finishes by roughly day 18 – 22. Call (833) 749-3967 for a timeline mapped to your specific kitchen.
Usually not for a like-for-like swap that stays inside the existing footprint. You do need one if the project moves walls, relocates gas or electrical, or changes any exterior opening that triggers design review. We pull the permits and manage the inspection, and we’ll tell you upfront which category your job falls into.
Yes. Most cabinet and countertop projects stay in the existing sink, range, and wall positions, which keeps them out of permitting and out of the plumbing trades. If you want the sink moved under a window or a range shifted for a better layout, that’s doable, it just adds a trade scope and a permit step.
Expect $14,000 – $45,000 for the full run, with cabinets at $4,000 – $13,000 and counters at $2,000 – $6,500. Access, existing wall condition, and material grade are the biggest levers. Call (833) 749-3967 for a free on-site estimate with a written line-item quote.
Every project we complete is backed by the 730-Day Done Right Promise: if something isn’t done right, we make it right. That covers workmanship and installation. Material warranties from KraftMaid, Grohe, and the countertop fabricator come alongside it. Call (833) 749-3967 to schedule your free estimate.
Get a free cabinets & countertops estimate in Laguna Beach
Call (833) 749-3967 to set up a free on-site estimate. We’ll walk the kitchen, check the walls and access, and hand you a written line-item quote with upfront pricing. Calls are answered by a live person, 24/7. If your project is part of a bigger scope, take a look at Kitchen Remodeling in Laguna Beach, and if you’re weighing the whole house, our Kitchen Remodeling service page covers how we run a full build. We work across Laguna Beach and the surrounding canyons.
Written by the team at Groundwork Construction Co.












