Tub-to-Shower Conversion in Tustin, CA: What It Takes and What It Costs
A tub-to-shower conversion in Tustin typically runs $3,500 to $10,000 and takes five to eight working days once demolition starts. We pull the tub, open the wall to the studs around the wet zone, re-line and waterproof the shower, then set new tile, a pan, a drain and fixtures. Most Tustin conversions we quote land in the $5,500 to $8,000 range once you pick tile and glass. Call (833) 749-3967 to schedule a free on-site estimate.
How the conversion actually goes, day by day

Every conversion follows the same seven-to-ten-day arc. Here’s what happens in each stage, and what you decide along the way.
Day 1: Demo and discovery. We pull the tub, remove the surround and old drywall, and expose the studs, valve and drain line. On a 1960s ranch in 92780, that’s the day we find out whether the galvanized supply lines have already been swapped to copper or PEX. If they haven’t, we quote the re-pipe before touching tile. You decide whether to do that now or defer it.
Day 2: Rough-in and framing. We set the new drain position, re-frame for the shower footprint, and rough in the rough valve. If you want a bench, a niche or a curbless entry, this is the day it gets built. You decide the shower’s finished width and door configuration before the frame goes up.
Day 3: Permit inspection (where required). Tustin requires a plumbing and electrical permit for most conversions, and the rough inspection happens before anything goes back on the wall. We pull the permit and schedule the inspector. On a live job in Tustin Ranch, that inspection is usually a next-day turnaround.
Days 4 – 5: Waterproofing and pan. This is where the shower either lasts 30 years or fails in five. We install a bonded waterproof membrane system (Schluter is what we use on most conversions), build a sloped mortar pan, and flood-test it. You don’t decide anything here. This part isn’t optional.
Days 6 – 8: Tile, glass and trim. Wall tile, floor tile, curb, niche, and the trim kit. Glass gets templated here and installed two to four days later once the setting material cures. You pick grout color and glass style on day 1 so nothing delays the finish.
Day 9 – 10: Fixtures, caulk and final inspection. Showerhead, hand-held, valve trim and the final permit sign-off. We walk the job with you, run water, and check slope.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
Here’s where the money and the look come from. None of these are “right,” but they cost different amounts and hold up differently.
- Shower pan material. A tile-over-mortar pan with a bonded membrane (Schluter Kerdi or a comparable system) runs $300 – $700 more than a pre-formed acrylic pan but won’t crack at the seams in 12 years. It’s what we specify on most Tustin conversions.
- Wall tile. Porcelain and ceramic tile runs $4 – $9/sq ft for the material. Large-format slab (12″x24″ or larger) is $9 – $18/sq ft and shows fewer grout lines. Slab looks better and cleans easier; tile is more forgiving on a wall that isn’t perfectly square.
- Shower valve and trim. A Grohe or Kohler valve with a thermostatic trim adds $400 – $900 over a builder-grade unit. Worth it if you have kids or the shower shares a water line with the kitchen.
- Glass. Frameless tempered glass adds $900 – $2,200. Semi-frameless is $400 – $900 and holds up fine if you’re not chasing the look.
- Curbless entry. Adds $600 – $1,500 in framing and pan work, but it’s the single most requested upgrade from Tustin buyers aging in place.
- Bench and niche. Framed bench runs $350 – $700, recessed niche $150 – $350. Both are much cheaper to add during framing than after tile.
What Tub-to-Shower Conversion costs in Tustin, CA

The honest range for a Tustin conversion is $3,500 to $10,000, and the median job we quote sits around $6,000. Here’s what pushes a job to one end or the other.
- Size and footprint. A standard 5′ alcove conversion sits at the low end. A 4′ x 6′ walk-in with a bench pushes toward the high end.
- Existing plumbing condition. Original galvanized supply lines in a 1960s 92780 ranch add $1,500 – $3,500 to re-pipe. This is the biggest single variable in Tustin.
- Relocating the drain or valve. A same-spot conversion keeps costs low. Moving the drain to a different wall adds $600 – $1,500 in plumbing and pan work.
- Material grade. Builder-grade tile and an acrylic pan toward $3,500. Porcelain slab, frameless glass and a thermostatic valve toward $10,000.
- Permit scope. Standard plumbing and electrical permits are part of our written estimate. Structural changes (moving a wall) pull a separate permit and add cost.
Our written estimates are line-item and fixed: the number you see is the number you pay. No change orders once work starts unless the scope changes at your request. Free on-site estimate, no obligation.
See the difference
Before
After
Before
After
Before
AfterWhat Tustin homes specifically do to this job
The Tustin you’re working in depends on which side of the 5 you live on. A 1960s ranch in 92780 sits on original galvanized plumbing and thin stucco, and those two facts shape the conversion: the supply lines are often one bad winter from a pinhole, and we’ve opened more than a few walls in the Red Hill and Peppertree neighborhoods to find a shower valve that had been patched twice. Columbus Square and Tustin Ranch (92782) are a different animal. Those 1990s-2000s Mediterranean tract homes came with builder-grade shower surrounds and valves that are now 25 years old and starting to fail at the cartridge. We barely bat an eye at the permit process in Tustin because the city still pulls permits on most conversions and the rough inspection has to happen before anything closes up. Anything in the former MCAS Tustin footprint adds a layer of environmental and historical review on the permit side, and we build that timeline into the schedule. The Santa Ana wind seasons mean we spec fire-rated backer board and seal penetrations on the exterior side of any shower wall mounted on an exterior wall, since ember intrusion through vents and gaps is a real concern for the foothill-adjacent lots.
Serving Tustin, CA – Our Local Coverage Area
We serve Tustin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Tub-to-Shower Conversion in Tustin

Most Tustin conversions finish in seven to ten working days once demo starts, with glass installation adding two to four days for cure time. If we’re re-piping galvanized lines, add two to three days. Call (833) 749-3967 for a schedule based on your specific bathroom.
Yes, Tustin requires a plumbing and electrical permit for most conversions, and the rough inspection must pass before walls close. We pull the permit and schedule the inspection as part of the job. We don’t start work that needs one without one.
In most cases, yes, and it’s also the cheapest path. Keeping the drain and valve in the same wall keeps a Tustin conversion at $3,500 – $6,000. Moving the drain across the room is $600 – $1,500 in added plumbing and framing.
Tustin conversions run $3,500 to $10,000, with a typical job around $6,000. A galvanized re-pipe or a curbless entry pushes you toward the top. Call (833) 749-3967 for an exact line-item quote, free on-site.
Every Tub-to-Shower Conversion we complete is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That covers workmanship, waterproofing and installation. Call (833) 749-3967 if you want to see the written warranty before signing.
Get a free Tub-to-Shower Conversion estimate in Tustin
Call (833) 749-3967 to book a free on-site estimate for your Tub-to-Shower Conversion in Tustin. A live person answers around the clock, so you’re never sent to voicemail. We measure your bathroom, check the plumbing condition, walk you through material options, and leave you with a written line-item quote and 0% financing for 18 months, plus $1,000 off projects over $10,000.
Written by the team at Groundwork Construction Co.