







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What Cabinet & Countertop Work Costs in Irvine, CA – and How Long It Takes
Cabinets & countertops in Irvine typically run $14,000 – $45,000 for a full kitchen’s worth of new cabinetry and slab counters, including removal, installation, plumbing reconnects and finish carpentry. Most Irvine jobs land in the $18,000 – $28,000 range and take three to five weeks from template to final caulk. Call (833) 749-3967 for a free on-site estimate – we’ll measure your actual kitchen and hand you a written line-item number.
How the job actually runs, stage by stage

Cabinet and countertop work is a sequence, not a single visit. Here’s the real shape of it in Irvine kitchens, with the decisions that land on you at each step.
Stage 1 – Measure and finalize (week one)
We template your space, confirm appliance sizes and check whether the wall behind the old cabinets is flat. You sign off on the cabinet layout, door style and countertop material in this window, because everything downstream is built to those specs. A lead time of 10-15 business days for semi-custom boxes like KraftMaid is normal; stock lines move faster.
Stage 2 – Demo and prep (days one and two)
Old cabinets, counters and backsplash come out. We check the subfloor, patch drywall, cap or reroute plumbing, and confirm the electrical rough-in for any new outlets or under-cabinet lighting. If you’re relocating a sink or moving the range, this is when that decision has to be locked – changing it after the boxes are hung costs time and money.
Stage 3 – Cabinet installation (days three through five)
Base and upper boxes go in level, shimmed and shimmed again until the reveal lines are dead straight. Drawers, doors and pulls follow. This is the stage where cheap installation shows: gaps at the ceiling, doors that rub, fillers cut wrong. We set cabinets to the actual room, not the drawing.
Stage 4 – Countertop template and install (days six through fifteen)
Once the boxes are in, the countertop gets templated on site. Fabrication for quartz or natural stone takes roughly 7-10 business days at most Irvine-area shops, then the slabs drop in. Sink cutouts, faucet holes and edge profiles are set in this stage. You’ll want the sink and faucet on hand before install day.
Stage 5 – Finishes and punch (final days)
Caulk lines, toe kicks, touch-up, appliance reconnects and a walkthrough. We test every drawer, every door and every water line before we hand the kitchen back. Any punch items get fixed before the final invoice, which is the point of a written workmanship guarantee.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually be making
Most of the cost swing on this job comes from three picks: cabinet construction, countertop material and edge profile. Here’s the honest trade-off on each.
- Stock vs. semi-custom cabinets: Stock boxes are cheapest and fastest, but you’re stuck with standard sizes and limited finishes. Semi-custom (KraftMaid and Wellborn both live here) lets you fit the actual wall run, choose a door profile and pick the interior pull-outs. The gap is usually several thousand dollars, and it’s the difference between a kitchen that looks built-in and one that looks assembled.
- Quartz vs. granite vs. natural stone: Quartz is non-porous, needs no sealing and holds a consistent look – it’s the default in Irvine tract kitchens. Granite is natural, unique and slightly more forgiving of heat, but needs periodic sealing. Marble reads best in photos and stains easiest – fine for a low-use kitchen, less so for a busy family.
- Edge profile and slab thickness: A standard eased edge on a 2cm slab is the value pick. A mitered or built-up edge on 3cm reads thicker and adds real cost per linear foot.
- Cabinet boxes and hardware: Plywood boxes outlast particleboard in a humid kitchen. Soft-close hinges and full-extension drawers cost more up front and are the first thing to fail on cheap hardware.
- Relocation vs. same footprint: Keeping the sink and range where they are is the single biggest money-saver. Moving either triggers plumbing and electrical work that pushes a project toward the top of the range.
What Cabinets & Countertops cost in Irvine, CA

A full cabinet and countertop replacement in an Irvine kitchen lands between $14,000 and $45,000, depending on the size of the kitchen, the material grade and how much plumbing or electrical moves. Here’s the typical line-item breakdown:
- Cabinet installation: $4,000 – $13,000 (semi-custom and custom higher; stock lower)
- Countertop installation: $2,000 – $6,500 (quartz and granite sit mid-range; exotic stone higher)
- Backsplash: $800 – $2,500, depending on tile and coverage
- Island or peninsula: $3,000 – $10,000 if you’re adding one
What pushes the number up: relocating the sink or range (plumbing and electrical), adding an island with its own electrical drop, choosing exotic stone or a mitered edge, and a kitchen with more than 20 linear feet of counter run. What keeps it lower: same footprint, stock cabinets, standard edge, and keeping existing appliances and lighting.
What’s in a written estimate: demo, haul-away, cabinet and countertop supply and install, standard plumbing reconnect, and punch-list touch-ups. What typically isn’t: appliance purchase, major electrical or plumbing relocation, and structural changes. We list those as separate line items so nothing shows up as a surprise mid-job. Upfront pricing, no surprises – the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Irvine homes specifically do to this job
Irvine isn’t Santa Ana or Tustin. It’s a master-planned city built almost entirely by the Irvine Company from the 1970s forward, and that shows up in cabinet and countertop work in ways you don’t see one city over. Homes in villages like Woodbridge, Northwood and Turtle Rock sit under HOA architectural review committees, and Irvine’s own municipal code adds a layer of design review on top of the county permit. When you’re changing counter material, swapping cabinet door colors or altering a visible facade through a kitchen window run, expect a palette and material submittal. That approval gate alone can add one to two weeks to the schedule, and it’s why we ask for finish selections before demo, not after.
The housing stock shapes the work too. Post-1970 tract homes mean cabinet layouts that repeat across a neighborhood – and repeat the same failure modes. In Woodbridge kitchens we routinely find original particleboard boxes swelling at the sink base after 30-plus years of slow leaks, and in Great Park-area new builds we see builder-grade counters installed with minimal seam support. The semi-arid Irvine climate helps: no freeze delays, no heavy-rain windows, so a cabinet install rarely slips on weather. What it does mean is dry-season heat baking exposed framing between demo and install, so we cover and finish quickly rather than letting boxes sit open for a week. If the kitchen project grows beyond cabinets and counters into layout changes, that becomes part of a full Kitchen Remodeling in Irvine scope, and we’ll tell you honestly when it does.
Serving Irvine, CA – Our Local Coverage Area
We serve Irvine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Irvine

Most Irvine cabinet and countertop projects run three to five weeks from signed layout to final walkthrough, with the countertop fabrication window (usually 7 – 10 business days) being the biggest variable. HOA or city design review can add one to two weeks if your village requires a material submittal. Call (833) 749-3967 for a schedule based on your actual kitchen and village.
A like-for-like cabinet and countertop swap usually doesn’t need a building permit, but anything that moves plumbing, electrical or a wall does – and Irvine’s design-review process may apply even when the county permit doesn’t. We’ll confirm the scope during the estimate and tell you in writing whether a permit is required before any work starts.
Yes – keeping the sink, range and walls in place is the most common and most affordable version of this job. The new cabinet boxes are built to the existing rough-in, and the countertop templates to the installed boxes. If you want to move the sink or add an island with a drop, that’s a different scope and priced separately.
Expect $14,000 – $45,000 for a full kitchen, with most Irvine jobs landing around $18,000 – $28,000. Cabinet installation alone runs $4,000 – $13,000 and countertop installation $2,000 – $6,500. Call (833) 749-3967 for an exact quote on your kitchen – estimates are free and itemized in writing.
Every cabinet and countertop project is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right, for two full years. That’s one of the longest workmanship guarantees in the residential construction space. Manufacturer warranties on the cabinets and slabs ride on top of that.
Get a free cabinet and countertop estimate in Irvine
Call (833) 749-3967 to schedule a free on-site estimate for cabinets & countertops in Irvine. A live person answers around the clock, and a background-checked technician will measure your kitchen, walk the material options with you, and hand you a written line-item quote – no change orders later. Projects over $10,000 qualify for $1,000 off and 0% financing for 18 months. Our technicians have up to 12 years of experience, and our Kitchen Remodeling team covers the wider scope if your project grows. We work across Irvine, and homeowners often pair this with Walk-In Showers & Shower Remodeling in Irvine or a Tub-to-Shower Conversion in Irvine while the crew is already on site.
Written by the team at Groundwork Construction Co.












